Question: What is staggered lapping?

Why is staggered lapping of reinforcement?

A Lap is required when two pieces of reinforcing bar (rebar) are overlapped to produce a constant line of rebar. The length of the lap fluctuates according to the concrete strength, the rebar grade, size, and spacing. The objective of lap is to transmit load from one bar to another bar as well as retain continuity.

What is stagger in civil engineering?

The staggered truss system is a type of structural steel framing used in high-rise buildings. The system consists of a series of story-high trusses spanning the total width between two rows of exterior columns and arranged in a staggered pattern on adjacent column lines.

What are staggered bars?

When we provide lapping in the bars, the level of the lapped part of the bar is kept in up and down position from one another. This method of lapping in different levels in all types of structural members is called as staggering of the bars. To prevent the buckling of the RCC structure. ...

How do you stagger reinforcement?

10:3813:17Reinforcement lapping and staggering - YouTubeYouTubeStart of suggested clipEnd of suggested clipSo if this is your column beam junction. I would recommend you to lap some of the reinforcement.MoreSo if this is your column beam junction. I would recommend you to lap some of the reinforcement. Maybe in the middle of the column. Yeah so here you will have the lap. And remaining will be staggered.

What is lapping in column?

Lapping zone : When we provide lapping in a column, all the rebars should be lapped in zone-B as shown in the drawing. The top and bottom portion of the column, i.e. zone-A ( L/4 length ) should be avoided as there will be a maximum moment in this zone due to lateral forces acting on the column.

Where is lapping provided in beam?

The lapping zone for the top bars should be at the mid- L1/3 or L2/3 part of the beams. Reason: The top bars fall under the compression zone of the beam. For the compression zone, the mid-1/3 span of the beam is said to be a safe zone for lapping.

Where do you put a column in a lap?

As per I.S. 13920 Vertical bars of Columns shall be lapped in regular zone (Mid-height ) only and it should be staggered i.e. not more than 50% of bar can be lapped at one section. In addition to that minimum clear vertical distance between lapped bars shall be 0.25 times lap length.

What is Lap length in reinforcement?

If length of a bar is not enough to keep the reinforcement, we have to lap two steel bars. Normally, lapping position is at where near the minimum shear force is acting. Normally lap length is 50D meaning 50 times the bar diameter if both bars are of same diameter.

Is code for column lapping?

13920 Vertical bars of Columns shall be lapped in regular zone (Mid-height ) only and it should be staggered i.e. not more than 50% of bar can be lapped at one section. In addition to that minimum clear vertical distance between lapped bars shall be 0.25 times lap length.

How do you lapping a column?

4:139:41Rules for Lapping in RCC Columns - YouTubeYouTube

What is the lapping length?

This amount of overlapping between two bars is called “lap length”. Lapping is usually done where minimum bending stress is encountered. In general, lap length is 50d which means 50 times the bar diameter, if both bars are of same diameter.

What is lapping in beam?

Top reinforcement in beam is lapped at mid span as the beam does not experience any negative moment at midspan and so lapping is great in that region. In case of bottom reinforcement it is lapped near the ends and again the same concept applies as there will be no positive moment at the ends of the beam.

What is the minimum lapping length?

What is the minimum lap length? For direct tension, the straight length of the lapping bar shall not be less than 15d or 20 cm. While in the case of compression lapping should not be less than 24d.

Is 456 a lapping column?

According to IS 456: 2000 For direct tension, the lap length should be 2 Ld or 30d whichever is greater is considered. In this case, the straight length of the lapping bar shall not be less than 15d or 20cm.

What is lapping formula?

Normally lap length is 50D meaning 50 times the bar diameter if both bars are of same diameter. When lapping two bars of different diameters, the lap length is considered as 50 times the smaller diameter. Steel bar lapping in construction. Steel Lapping Formula Lap length = 50 X Diameter.

How is Lap length calculated?

Lapping can be defined as the overlapping of two bars side by side to upto the design length. Lapping is usually done where minimum bending stress is encountered. In general, lap length is 50d which means 50 times the bar diameter, if both bars are of same diameter.

Is code for lapping?

13920 Vertical bars of Columns shall be lapped in regular zone (Mid-height ) only and it should be staggered i.e. not more than 50% of bar can be lapped at one section. In addition to that minimum clear vertical distance between lapped bars shall be 0.25 times lap length.

What is minimum lapping length?

What is the minimum lap length? For direct tension, the straight length of the lapping bar shall not be less than 15d or 20 cm. While in the case of compression lapping should not be less than 24d.

What is lapping zone?

Lapping zone : The top and bottom portion of the column, i.e. zone-A ( L/4 length ) should be avoided as there will be a maximum moment in this zone due to lateral forces acting on the column.

What is lapping steel?

Lapping can be defined as the overlapping of two bars side by side to upto the design length. Usually, the stock length of steel bars is limited to 12m. This is for easy transportation of steel bars to the construction site. For example, imagine there is a need to build a 100ft tall column.